The windscreen supported on wood blocks for the front painting. The hood after its olive coat, while the grill waits its turn.

The screen and hood clamps added. The canvas roof studs are silly money for what they are.

Trial fit of the rubber screen seal.
 
Markings! The first stencil for the 100th Bomb Group Photo Lab jeep.

The stencil removed. The grill in its undercoat.....

.....and in olive drab. The front bumper in OD.

The hood trial fitted. The windscreen needed a bit of adjusting of its arms to fit.

The passenger seat had some pitting and holes in the backrest. After brazing, but before it was dressed flush with the skin.

The front of the seat had also come away from the frame. Holes were drilled through to the frame so that I could braze through.

The last parts of the fuel pipe were formed to run from the engine to the firewall fuel filter. This section runs from the fuel pump, across the front of the engine block to behind the alternator where it joins the flexipipe.

ASSEMBLY 1  ASSEMBLY 2  ASSEMBLY 3  ASSEMBLY 4  ASSEMBLY 5  ASSEMBLY 6

ASSEMBLY 7  ASSEMBLY 8  ASSEMBLY 9  ASSEMBLY 10  ASSEMBLY 11  ASSEMBLY 12  ASSEMBLY 13

HOME